Home Gallery Contact Events & Projects Projects: 2019 On Film & TV Archive & Links |
2020 Furnace and Lehr at Quarley - Firing Five (May 2021)
Projects: 2019 Onwards
Shelter Build
Wood Gathering and Processing
General Preparation
Firepit Construction
Furnace Installation
Lehr Installation
Floodproofing
Firings One and Two
Firing Three
Firing Four
Firing Five
Firing Six
This was a nine-day firing, running from the 15th to the 23rd May, 2021. The weather was variable: rainy and windy, with some sun. Temperatures were around 8°C - 12°C. We lit the furnace at around 07.30 and charged the pots at about 11.00, when the furnace temperature reached 1000°C. We blew glass from about 11.30 until 13.00, broke for lunch, worked from 13.45 until about 17.45, then blew from about 18.30, finishing at |
about 20.00 and emptying the pots - which took about fifteen to twenty minutes. This regime worked for all of us and meant that total blowing time each day was about seven hours. We mainly undertook production work, but we also had several post grad students visiting and stoking for a few days. |