The Glassmakers Home   Gallery   Contact   Events & Projects   Projects: 2019 On   Film & TV   Archive & Links IFoG Furnace

2019 IFoG Furnace and Lehr at Stourbridge - Testing Furnace for Size

Projects: 2019 Onwards   Daub Creation   Furnace Build   Lehr Build   Furnace Disassembly & Reassembly   Testing Furnace for Size

Lehr Disassembly & Reassembly   Collars, etc.   Assembly at Stourbridge   Glassblowing at Stourbridge   Disassembly at Stourbridge

Testing the Furnace for Size

As the furnace had now dried it could now be tested for the correct gathering hole height, and we could work out if it needed to be raised or lowered by either making a tile support for it to stand on or by digging a channel in the ground where it was to be sited. Fortunately, these adjustments were not necessary.

Now we knew that the height was correct we could build the wooden marver tables and pipe-warming stands (we had already made cracking-off stands for the irons).


Marver table Pipe-warmingstand Cracking-off stand
IFoG Furnace
IFoG Furnace IFoG Furnace
IFoG Furnace IFoG Furnace
IFoG Furnace IFoG Furnace

Home   Gallery   Contact   Events & Projects   Projects: 2019 Onwards   Film & TV   Archive & Links